Friday 5 November 2010

Holidays for Duncan


Ancient artefact and a pyramid

Having been commissioned to design and build an exhibition stand for Cambridge based Cambridge Broadband Networks at North Africa Com in Cairo, it would have been foolish not to have also done a whistle stop tour of Cairo's main attractions - Pyramids, Egyptian Museum etc.

But this was work, and not a holiday (!), and needless to say the stand installation and breakdown went without a hitch. The client was absolutely delighted with the stand and the show was a resounding success.

Designed and built using existing GGS Octanorm modular hire stock, the stand was sent to the venue by air freight. Thankfully all of the kit cases were waiting on the stand space when Duncan arrived (phew); ready to build and install all the client's product /equipment.

Tomorrow duncan heads off to Cape Town to perform a similar exercise at Africa Com. This will also be built using Octanorm hire stock, but on this occasion due to higher air freght costs (bigger stand, further to go) we have partnered with a Cape Town based company who use exactly the same world leading Octanorm modular hire equipment as us. GGS will build the stand on site, install all the clients demonstration equipment, and be available for support for the duration of the exhibition.

And, no doubt, there will be some more sightseeing...

No comments:

Post a Comment